Project 1

Name: The Shard
Size: £19,000
Location: London, England
Status: Complete
Date: 2012
Role: Supply and installation of Powershield steel FIRE DOORS
Description of Challenge: This project was to supply 29 single fire door sets high up in the Shard Spire. This is the steel structure that sits onto the concrete core. The doors were installed by Emtec who were the specialist subcontractors fitting out the plant areas. Installing doors at this height was challenging and health and safety issues were paramount to ensure the operations were completed safely and professionally.

 Project 2

Name: Chiswick Park
Size: £200,000
Location: London, England
Status: Complete
Date: 2014
Role: Manufacture and installation of Powershield FIRE DOORS
Description of Challenge: Chiswick park is a high specification business park development in an important part of London. Our doors were specified by the architect which needed to meet the high aesthetic expectations of the high class interiors of the office blocks. Special details such as hidden frames and special fin-ished were developed to meet those requirements.

 Project 3

Name: Olympic Stadium Redevelopment
Size: £100,000
Location: London, England
Status: Complete
Date: 2015
Role: Manufacture and installation of Powershield fire and LPS security doors
Description of Challenge: As well as supplying the doors to the original Olympic stadium back in 2012, ASSA ABLOY security doors were appointed to supply doors for the redevelopment of this iconic building. Both fire and security doors were installed into the redeveloped stadium to help protect this iconic building. There were a number of challenges on the project, not least to meet the critical deadlines for comple-tion in advance of the Rugby World Cup. We were highly commended by Balfour Beatty for rising to and successfully completing this challenge.

 Project 4

Name: The Mary Rose Museum
Size: £17,000
Location: Portsmouth, England
Status: Complete
Date: 2011
Role: Manufacture and installation of Powershield Steel FIRE DOORS
Description of Challenge: This highly prestigious was built to provide a permanent home for the iconic Mary Rose, flagship of Henry vi naval fleet, which sunk off the Solent in the 14th Century. Powershield steel fire doors were installed through out the boat shaped building to provide security and fire projection to the priceless assets.

Project 5

Name: Manchester Velodrome
Size: £20,000
Location: Manchester, England
Status: Complete
Date: 2015
Role: Manufacture and installation of Powershield Steel - SR4
Description of Challenge: The National Cycling Centre in Manchester has become one of the world’s fastest board tracks. Regular users of the track include members of the Great Britain Cycling Team, as well as local schoolchildren and cycling enthusiasts. The track is open seven days a week and is one of the busiest tracks in the world; therefore, access and security is paramount.

Other notable projects:

Company Name

Total Value of Orders Placed

Contractor

Terminal T2A Heathrow

£4.72M

HETCo
(Laing O'Rourke / Ferrovial)

Buckingham Gate £850K

Sir Robert McAlpine

Project Fox £880K

Mace / Santandar

Terminal 2 - Dublin
Airport

£1.3M

PJ Hegarty

BP4, Churchill Place

£820K

Canary Wharf
Contractors

Sir Robert McAlpine

£ 4,330,000

Emirates Stadium, Watermark Place, Cardinal Place, ExCeL Centre, Riverbank House